Parcellary mapping of proposed Kirahon-Maramag 230KV Transmission Line Project

Client:
National Transmission Corporation

Type of consulting service:

  • Parcellary and Subdivision Survey
  • GPS control survey
  • Topographic survey
  • Route survey
  • Research, subdivision and segregation of properties encroaching the proposed T/L corridor
  • Validation of the lots affected by the proposed transmission line corridor

Location:
Kirahon to Maramag in Mindanao (105 KM)

Date of contract:
November 6, 2006 to May 6, 2007

Project Duration:
180 days

Actual Project Completion:
180 days

Client Address:
Diliman, Quezon City