Completed

CALIFORNIA ENERGY INTERNATIONAL SERVICES INC.
Address : Ayala Avenue, Makati City
Name of project : AKLAN HYDROPOWER PROJECT (SERVICE CONTRACT)
Location : Libacao, Aklan
Date of contract : November 2006 – June 2007
Type of consulting service : GENERAL SURVEYING SERVICES GEOLOGIC MAPPING & SOIL INVESTIGATION TOPOGRAPHIC SURVEY OF THE AKLAN RIVER AND THE PROPOSED DAM SITE, ROAD SURVEY, PARCELLARY SURVEY AND VOLUMETRIC ANALYSIS. The job includes Geologic Mapping Sub-surface Investigation, GPS SURVEY, Hydrographic Survey, Topographic Survey, Parcellary, Relocation and Subdivision Survey of affected properties. To monitor the effective volume of water deposit in the area and the properties affected.
Project Duration : 1 year
Actual Project Completion : 8 months

NATIONAL TRANSMISSION CORPORATION
Address : Diliman, Quezon City
Name of project : PARCELLARY MAPPING OF PROPOSED KIRAHON – MARAMAG 230 KV TRANSMISSION LINE PROJECT.
Location : KIRAHON to MARAMAG in MINDANAO (105Km)
Date of contract : November 6, 2006 to May 6, 2007
Type of consulting service : PARCELLARY AND SUBDIVISION SURVEY. The job includes GPS control survey, topographic survey, route survey, research, subdivision and segregation of properties encroaching the proposed T/L corridor. Validation of the lots affected by the proposed transmission line corridor.
Project Duration : 180 days
Actual Project Completion : 180 days

 

CE CASECNAN WATER AND ENERGY COMPANY INC.
Address : Pantabangan, Nueva Ecija
Name of project : GEODETIC MONITORING of the Casecnan and Taan Dams
Location : Casecnan and Taan
Date of contract : January 8-19, 2007
Type of consulting service : GEODETIC MONITORING. The job includes the GPS SURVEY and GEODETIC MEASUREMENT OF THE MONITORING POINTS to check the deformation of the Dam if any.
Project Duration : 12 days
Actual Project Completion : 30days

 

RIVERHEAD DEVELOPMENT CORPORATION .
Address : Ayala Avenue, Makati City
Name of project : Detailed topographic survey of Lots 1-A, 1-B-1 and 1-B-2 and tagging of trees
Location : Mindoro
Date of contract : November 20, 2006 – December 21, 2006
Type of consulting service : Topographic and property survey. The job includes boundary survey, GPS control survey, detailed topographic survey, contouring and identification of trees.
Project Duration : 60 days
Actual Project Completion : 50days

 

CE CASECNAN WATER AND ENERGY COMPANY INC.
Address : Pantabangan, Nueva Ecija
Name of project : Topographic Survey of the Casecnan and Taan reservoirs including the tail end of Abaca, Casecnan, Lipuga and Taan Rivers and the Logpond area.
Location : Casecnan and Taan
Date of contract : June 17, 2006 – July 20, 2006
Type of consulting service : TOPOGRAPHIC & PARCELLARY SURVEY AND VOLUMETRIC ANALYSIS. The job includes GPS SURVEY, Hydrographic Survey, Topographic Survey, Parcellary, Relocation and Subdivision Survey of affected properties. To monitor the effective volume of water deposit in the area and the properties affected.
Project Duration : 45 days
Actual Project Completion : 33 days

 

SOLID CEMENT CORPORATION
Address : Bo. Tagbac, Antipolo, Rizal.
Name of project : Detailed topographic survey and volumetric analysis of the PAMIAS-II QUARRY DEPOSIT for SOLID CEMENT CORPORATION.
Location : Antipolo, Rizal
Date of contract : February 2006 – March 2006
Type of consulting service : Volumetric and property survey. The job includes boundary survey, GPS control survey, detailed topographic survey, contouring and volumetric analysis.
Project Duration : 45 days
Actual Project Completion : 30 days

CE CASECNAN WATER AND ENERGY COMPANY INC.
Address : Pantabangan, Nueva Ecija
Name of project : GEODETIC MONITORING of the Casecnan and Taan Dams
Location : Casecnan and Taan
Date of contract : January 23, 2006 – February 6, 2006
Type of consulting service : GEODETIC MONITORING. The job includes the GPS SURVEY
and GEODETIC MEASUREMENT OF THE MONITORING POINTS
to check the deformation of the Dam if any.
Project Duration : 12 days
Actual Project Completion : 30days

CEMEX (APO CEMENT CORP, SOLID CEMENT CORP & ISLAND QUARRY AND AGGREGATES ICORPORATION)
Address : Petron Mega Tower, Makati City.
Name of project : Volumetric survey of Bulk materials, Aggregates and Fuel in Apo Cement
Plant. Solid Cement Plant, Island Quarry and Aggregates Corporation by
computerized method and CAD.
Location : Antipolo Rizal and Naga Cebu.
Date of contract : December 2005 to April 2006
Type of consulting service : VOLUMETRIC SURVEY
The job includes GPS control survey, detailed topographic survey,
contouring and volumetric analysis.
Project Duration : 6 months (60 days periodic monitoring)
Actual Project Completion : (April 2006)

QUEZON POWER PLANT (COVANTA ENERGY CORP / CDSI)
Address : 1215 Mega Plaza Building, ADB Avenue cor Garnett Road, Ortigas, Paisg City
Name of project : Periodic monitoring of BULK MATERIALS
Location : Mauban, Quezon
Date of contract : July 2005 to April 2006
Type of consulting service : Volumetric survey. The job includes boundary survey, GPS
control survey, detailed topographic survey, contouring and
volumetric analysis.
Project Duration : July 2005 to April 2006 (21 days periodic monitoring)
Actual Project Completion : April 2006

CE CASECNAN WATER AND ENERGY COMPANY INC.
Address : Pantabangan, Nueva Ecija
Name of project : Topographic Survey of the proposed Dam Sites in Taan and Kawayan Rivers
including the tail end of Abaca, Casecnan, Lipuga and Taan Rivers and the
Logpond area.
Location : Casecnan and Taan
Date of contract : August 3, 2005 – December 9, 2005
Type of consulting service : TOPOGRAPHIC & PARCELLARY SURVEY AND VOLUMETRIC
ANALYSIS.
The job includes GPS SURVEY, Hydrographic Survey, Topographic
Survey, Parcellary, Relocation and Subdivision Survey of affected
properties. To monitor the effective volume of water deposit in the
area and the properties affected..
Project Duration : 150 days
Actual Project Completion : 129 days

CEMEX / ISLAND QUARRY AND AGGREGATES ICORPORATION
Address : Bo. Tagbac, Antipolo, Rizal.
Name of project : Volumetric survey and monitoring of PANTAY QUARRY for ISLAND
QUARRY AND AGGREGATES CORPORATION by computerized method
and CAD.
Location : Antipolo Rizal
Date of contract : December 2005
Type of consulting service : VOLUMETRIC AND PROPERTY SURVEY. The job includes
boundary survey, GPS control survey, detailed topographic survey,
contouring and volumetric analysis.
Project Duration : 7 days
Actual Project Completion : on call basis

SOLID CEMENT CORPORATION
Address : Bo. Tagbac, Antipolo, Rizal.
Name of project : Detailed topographic survey and volumetric analysis of the PROPOSED
QUARRY DEPOSIT for SOLID CEMENT CORPORATION.
Location : Antipolo Rizal
Date of contract : September 2005 – November 2005
Type of consulting service : Volumetric and property suvey. The job includes boundary survey,
GPS control survey, detailed topographic survey, contouring and
volumetric analysis.
Project Duration : 60 days
Actual Project Completion : 45 days

CEMEX / ISLAND QUARRY AND AGGREGATES ICORPORATION
Address : Bo. Tagbac, Antipolo, Rizal.
Name of project : Volumetric survey and monitoring of PANTAY QUARRY for ISLAND
QUARRY AND AGGREGATES CORPORATION by computerized method
and CAD.
Location : Antipolo Rizal
Date of contract : June 2005
Type of consulting service : VOLUMETRIC AND PROPERTY SURVEY. The job includes
boundary survey, GPS control survey, detailed topographic survey,
contouring and volumetric analysis.
Project Duration : 7 days
Actual Project Completion : on call basis


CE CASECNAN WATER AND ENERGY COMPANY INC.
Address : Pantabangan, Nueva Ecija
Name of project : Topographic Survey of the Taan and Casecnan Dams Downstream Reservoirs,
Bridge Site#1, Bridge Site#2, Abaca Bridge Site, Lipuga River , Logpond area
and Geodetic Monitoring (m7) of Casecnan and Taan Intake Dams.
Location : Casecnan and Taan
Date of contract : December 15, 2004 – February 15, 2005
Type of consulting service :
TOPOGRAPHIC SURVEY & VOLUMETRIC ANALYSIS.
The job includes GPS SURVEY, Hydrographic Survey, Topographic
Survey. To monitor the effective volume of water and the silt deposit
in the reservoir.

GEODETIC MONITORING. The job includes the GPS SURVEY
and GEODETIC MEASUREMENT OF THE MONITORING POINTS
to check the deformation of the Dam if any.
Project Duration : 60 days
Actual Project Completion : 45days



NATIONAL TRANSMISSION CORPORATION
Address : Diliman, Quezon City.
Name of project : PARCELLARY MAPPING OF PROPOSED TRANSMISSION LINE OF NEGROS-PANAY INTERCONNECTIONPROECT AND NEGROS-CEBU
INTERCONNECTION UPRATING PROJECT.
Location : SUBA CTS – NAGA S/S in CEBU, PONDOL CTS – AMLAN S/S, (109Km)
MANSILINGAN S/S – TOMONTON CTS in NEGROS, (30Km)
SAN JUAN BAROTAC VIEJO S/S – DINGLE S/S in PANAY. (35Km)
Date of contract : June 7, 2004 to December 4, 2004
Type of consulting service : PARCELLARY AND SUBDIVISION SURVEY. The job includes GPS control survey, topographic survey, route survey, research, subdivision and segregation of properties encroaching the proposed T/L corridor.
Project Duration : 180 days
Actual Project Completion : 180 days

CEMEX / ISLAND QUARRY AND AGGREGATES ICORPORATION
Address : Bo. Tagbac, Antipolo, Rizal.
Name of project : Monthly volumetric survey and monitoring of PANTAY QUARRY for ISLAND QUARRY AND AGGREGATES CORPORATION by computerized method and CAD.
Location : Antipolo Rizal
Date of contract : 1997 – 2004
Type of consulting service : VOLUMETRIC AND PROPERTY SURVEY. The job includes boundary survey, GPS control survey, detailed topographic survey,
contouring and volumetric analysis.
Project Duration : 2004
Actual Project Completion : (monthly monitoring) after the last survey on September 2004.

NATIONAL TRANSMISSION CORPORATION
Address : Diliman, Quezon City.
Name of project : Investigation Survey of the proposed KIRAHON-MARAMAG 230KV T/L ROUTE (Schedule II & III) in Mindanao.
Location : Kirahon to Maramag in Mindanao.
Date of contract : October 31, 2003 until March 30, 2004
Type of consulting service : ROUTE SURVEY. The job includes GPS control survey, topographic survey, stake-out of tower location.
Project Duration : 120 days
Actual Project Completion : route survey and topographic survey completed on October 2003, Stake-out completed on July 2004 (one month)

CE CASECNAN WATER AND ENERGY COMPANY INC.
Address : Pantabangan, Nueva Ecija
Name of project : Topographic Survey of the Taan and Casecnan Reservoirs Intake.
Location : Casecnan and Taan
Date of contract : May 27, 2004 – June 20, 2004
Type of consulting service : TOPOGRAPHIC SURVEY & VOLUMETRIC ANALYSIS.
The job includes GPS SURVEY, Hydrographic Survey, Topographic
Survey. To monitor the effective volume of water and the silt deposit
in the reservoir.
Project Duration : 25 days
Actual Project Completion : 20 days

PRIME EXPONENT CONSTRUCTION INC.
Address : Suites 1506-1507 City Land Mega Plaza, Garnet Rd Cor ADB Ave, Ortigas Center, Pasig City.
Name of project : TOPOGRAPHIC and PARCELLARY SURVEY OF THE PROPOSED T/L ROUTE CORRIDOR
Location : MCFPP-KIRAHON-TAGOLOAN 138 KV T/L PROJECT in Mindanao
Date of contract : April 15, 2004 – May 15, 2004
Type of consulting service : DETAILED ENGINEERING SURVEY. The job includes the GPS SURVEY, TOPOGRAPHIC SURVEY, AS-BUILT SURVEY, ROUTE SURVEY and PARCELLARY SURVEY.
Project Duration : 30 days
Actual Project Completion : 30 days


NATIONAL TRANSMISSION CORPORATION
Address : Diliman, Quezon City.
Name of project : ROUTE SURVEY, STAKING & TOPOGRAPHIC SURVEY OF
TRANSMISSION LINE OF NEGROS-PANAY INTERCONNECTIONPROECT
AND NEGROS-CEBU INTERCONNECTION UPRATING PROJECT.
Location : SUBA CTS – NAGA S/S in CEBU, PONDOL CTS – AMLAN S/S, (109Km)
MANSILINGAN S/S – TOMONTON CTS in NEGROS, (30Km)
SAN JUAN BAROTAC VIEJO S/S – DINGLE S/S in PANAY. (35Km)
Date of contract :
Type of consulting service : INVESTIGATION SURVEY.
The job includes GPS control survey, topographic survey, profile survey.
Project Duration : 110 days (45 days Plan & Profile survey & 55 days stake-out & diagonal profile)
Actual Project Completion : Route survey & topographic survey – Dec 2003
Stake-out – May 20, 2004

NATIONAL POWER CORPORATION
Address : Diliman, Quezon City.
Name of project : Parcellary mapping and subdivision survey of the lots affected by the proposed
CODON-VIRAC 69KV T/L corridor in Catanduanes.
Location : Codon to Virac in Catanduanes
Date of contract : July 18, 2003 until March 8, 2004
Type of consulting service : PARCELLARY AND SUBDIVISION SURVEY. The job includes GPS control survey, topographic survey, lot survey, research,
subdivision and segregation of properties encroaching the proposed
T/L corridor.
Project Duration : 120 days + additional days for extra work (March 8, 2004)
Actual Project Completion : March 4, 2004

NATIONAL TRANSMISSION CORPORATION
Address : Diliman, Quezon City.
Name of project : Parcellary mapping and subdivision survey of the lots affected by the proposed ANISLAGAN-KM13-SURIGAO 69KV T/L corridor in Surigao.
Location : Anislagan to Km13 to Surigao City in Surigao
Date of contract : October 31, 2003 until February 28, 2004
Type of consulting service : PARCELLARY AND SUBDIVISION SURVEY. The job includes GPS control survey, topographic survey, lot survey, research,
subdivision and segregation of properties encroaching the proposed
T/L corridor.
Project Duration : 120 days
Actual Project Completion : January 10, 2004

NATIONAL TRANSMISSION CORPORATION
Address : Diliman, Quezon City.
Name of project : Parcellary mapping and subdivision survey of the lots affected by the proposed
CALACA-DASMARINAS 230KV T/L, SUCAT-ARANETA-BALINTAWAK
230KV T/L, BINAN-DASMARINAS 230KV T/L, TAYABAS-DASMARINAS
500KV T/L CORRIDORS.
Location : Binan, Dasmarinas, Calaca, Tayabas
Date of contract : August 27, 2003 – March 7, 2004
Type of consulting service : PARCELLARY AND SUBDIVISION SURVEY. The job includes GPS control survey, topographic survey, lot survey, research,
subdivision and segregation of properties encroaching the proposed
T/L corridor.
Project Duration : March 7, 2004
Actual Project Completion : December 13, 2003

NATIONAL POWER CORPORATION
Address : Diliman, Quezon City.
Name of project : Parcellary mapping and subdivision survey of the lots affected by the proposed
MOBO-CATAINGAN 69KV T/L corridor SCHEDULE II.
Location : Mobo to Cataingan in Masbate
Date of contract : July 18, 2003
Type of consulting service : PARCELLARY AND SUBDIVISION SURVEY. The job includes GPS control survey, topographic survey, lot survey, research, subdivision and segregation of properties encroaching the proposed T/L corridor.
Project Duration : 140 days + 40 days (additional area)
Actual Project Completion : December 10, 2003

CE CASECNAN WATER AND ENERGY COMPANY INC.
Address : Pantabangan, Nueva Ecija
Name of project : Geodetic Monitoring of the Casecnan and Taan Dams for CE CASECNAN WATER AND ENERGY COMPANY INC. and the DAM WATCH.
Location : Casecnan and Taan
Date of contract : August 9-15, 2003
Type of consulting service : TOPOGRAPHIC and HYDROGRAPHIC SURVEY OF THE TAAN DAM downstream. within the CASECNAN PROJECT AREA at Pelaway, Alfonso Castaneda, Nueva Viscaya.
Project Duration : 7 days
Actual Project Completion : 4 days

CE CASECNAN WATER AND ENERGY COMPANY INC.
Address : Pantabangan, Nueva Eciija
Name of project : Geodetic Monitoring of the Casecnan and Taan Dams for CE CASECNAN WATER AND ENERGY COMPANY INC. and the DAM WATCH.
Location : Casecnan and Taan
Date of contract : August 3-8, 2003
Type of consulting service : GEODETIC MONITORING. The job includes the GPS SURVEY and GEODETIC MEASUREMENT OF THE MONITORING POINTS
to check the deformation of the Dam if any.
Project Duration : 6 days
Actual Project Completion : 6 days

NATIONAL POWER CORPORATION
Address : Diliman, Quezon City.
Name of project : Parcellary mapping and subdivision survey of the lots affected by the proposed MAASIM-KIAMBA 69KV T/L corridor SCHEDULE I.
Location : Maasim to Kiamba in South Cotabato
Date of contract : March 15, 2003 until June 12, 2003
Type of consulting service : PARCELLARY AND SUBDIVISION SURVEY. The job includes GPS control survey, topographic survey, lot survey, research,
subdivision and segregation of properties encroaching the proposed T/L corridor.
Project Duration : 90 days (June 12, 2003)
Actual Project Completion : June 2, 2003

CE CASECNAN WATER AND ENERGY COMPANY INC.
Address : Pantabangan, Nueva Ecija
Name of project : Geodetic Monitoring of the Casecnan and Taan Dams for CE CASECNAN WATER AND ENERGY COMPANY INC. and the DAM WATCH.
Location : Casecnan and Taan
Date of contract : May 3-12, 2003
Type of consulting service : TOPOGRAPHIC and HYDROGRAPHIC SURVEY OF THE TAAN RESERVOIR within the CASECNAN PROJECT AREA at
Pelaway, Alfonso Castaneda, Nueva Viscaya.
Project Duration : 10 days
Actual Project Completion : 6 days

NATIONAL POWER CORPORATION
Address : Diliman, Quezon City.
Name of project : Parcellary mapping and subdivision survey for the affected lots by the proposed ABAGA-KIRAHON 230KV T/L CORRIDOR SCHEDULE III.
Location : Abaga to Kirahon in Mindanao
Date of contract : October 23, 20002 – March 7, 2003
Type of consulting service : PARCELLARY AND SUBDIVISION SURVEY. The job includes GPS control survey, topographic survey, route survey, research,
subdivision and segregation of properties encroaching with the proposed T/L corridor.
Project Duration : 180 days (October 23, 2002 – April 21, 2003)
Actual Project Completion : March 7, 2003

SAN ROQUE POWER CORPORATION
Address : 36th Flr., Enterprise Bldg., Tower I, Ayala Avenue, Makati City.
Name of project : SAN ROQUE MULTI-PURPOSE PROJECT
Location : San Roque, San Manuel, Pangasinan.
Date of contract : November 1997 until March 31, 2003
Type of consulting service : DETAILED ENGINEERING SURVEY, PARCELLARY MAPPING AND SUBDIVISION SURVEY of lots affected by the San Roque
Multi- Purpose Project Site in San Roque, San Manuel Pangasinan. The job includes boundary survey, GPS control survey, parcellary and property survey, detailed engineering survey, topographic survey, stake-out survey and preparation of maps and plans for approval and registration/titling of properties.
Project Duration : on call basis (supply of manpower and equipment for the project)
Actual Project Completion : March 31, 2003


CE CASECNAN WATER AND ENERGY COMPANY INC.
Address : Pantabangan, Nueva Ecija
Name of project : Geodetic Monitoring of the Casecnan and Taan Dams for CE CASECNAN WATER AND ENERGY COMPANY INC. and the DAM WATCH.
Location : Casecnan and Taan
Date of contract : February 5-11, 2003
Type of consulting service : GEODETIC MONITORING. The job includes the GPS SURVEY and GEODETIC MEASUREMENT OF THE MONITORING POINTS
to check the deformation of the Dam if any.
Project Duration : 6 days
Actual Project Completion : 6 days

SOLID CEMENT CORPORATION
Address : Bo. Tagbac, Antipolo, Rizal.
Name of project : Detailed topographic survey and volumetric analysis of the PAMIAS-II QUARRY DEPOSIT for SOLID CEMENT CORPORATION.
Location : Antipolo Rizal
Date of contract : November 30, 2002-December 15, 2002
Type of consulting service : Volumetric and property suvey. The job includes boundary survey, GPS control survey, detailed topographic survey, contouring and volumetric analysis.
Project Duration : 45 days
Actual Project Completion : 30 days

ISLAND QUARRY AND AGGREGATES CORPORATION
Address : Bo. Tagbac, Antipolo, Rizal.
Name of project : Monthly volumetric survey and monitoring of the finish aggregate products/materials using computerized system.
Location : Antipolo Rizal
Date of contract : 2000 – Dec 2002
Type of consulting service : Volumetric and property suvey. The job includes boundary survey, GPS control survey, detailed topographic survey, contouring and volumetric analysis.
Project Duration : one year
Actual Project Completion : monthly monitoring

KATAHIRA / CERTEZA
Address : Quezon City.
Name of project : Route survey of the SUYO-CERVANTES ROAD PROJECT.
A joint project with CERTEZA for KATAHIRA.
Location : Suyo and Cervantes in Ilocos Norte
Date of contract : June 2002 – October 2002
Type of consulting service : INVESTIGATION SURVEY. The job includes establishment of
survey controls (horizontal and vertical), profiling and cross-
sectioning, as-built of bridge and existing roads, river survey,
contouring, and road layout.
Project Duration : 120 days
Actual Project Completion : 100 days

CERTEZA
Address : Quezon City.
Name of Project : GPS SURVEY- Establishment of PHOTO CONTROL POINTS for the Mapping Project in Laguna and Batangas joint project with CERTEZA.
(JOINT PROJECT W/ CERTEZA)
Location : Paranaque, Laguna and Batangas
Date of contract : June 1, 2002 – August 15, 2002
Type of consulting service : GPS SURVEY. The job includes establishment of horizontal and vertical controls.
Project Duration : 75 days
Actual Project Completion : 70 days

CERTEZA
Address : Quezon City.
Name of project : River profile and cross-section survey of Baquero-Maraunot, Bucao and Sto Tomas rivers in Zambales for the study on SABO and FLOOD CONTROL for western river basins of Mt. Pinatubo. (JOINT PROJECT W/ CERTEZA)
Location : Zambales
Date of contract : May 31, 2002 – August 15, 2002
Type of consulting service : INVESTIGATION SURVEY. The job includes GPS survey, river course plan and profile and sections survey, bathymetric survey.
Project Duration : 75 days
Actual Project Completion : 70 days

NATIONAL POWER CORPORATION 
Address
 : Diliman, Quezon City.
Name of project: : Parcellary mapping and subdivision survey for the upgrading of the San Manuel to Paniqui 230kV Transmission Line Project.
Location : San Manuel Pangasinan to Paniqui Tarlac.
Date of contract : May 6, 20002 – August 4, 2002
Type of consulting service : PARCELLARY AND SUBDIVISION SURVEY.The job includes GPS control survey, topographic survey, route survey, research,
subdivision and segregation of properties encroaching the proposed T/L corridor.
Project Duration : 90 days
Actual Project Completion : 87 days

SOLID CEMENT CORPORATION
Address : Bo. Tagbac, Antipolo, Rizal.
Name of project : Detailed topographic survey and volumetric analysis of the PAMIAS-III QUARRY DEPOSIT for SOLID CEMENT CORPORATION.
Location : Antipolo Rizal
Date of contract : (July 2002)
Type of consulting service : Volumetric and property survey. The job includes boundary survey, GPS control survey, detailed topographic survey, contouring and volumetric analysis.
Project Duration : 45 days
Actual Project Completion : 30 days

CE CASECNAN WATER AND ENERGY COMPANY INC.
Address : Pantabangan, Nueva Ecija
Name of project : Geodetic Monitoring of the Casecnan and Taan Dams for CE CASECNAN
WATER AND ENERGY COMPANY INC. and the DAM WATCH.
Location : Casecnan and Taan
Date of contract : May 9-11, 2002
Type of consulting service : GEODETIC MONITORING. The job includes the GPS SURVEY and GEODETIC MEASUREMENT OF THE MONITORING POINTS to check the deformation of the Dam if any.
Project Duration : 3 days
Actual Project Completion : 3 days

NEWJEC INCORPORATED
Address : 20-19 SHIMANOUCHI I-CHOME, CHUO-KU, OSAKA 542, JAPAN
Name of project : Feasibility study of the Binga Hydroelectric Power Station Rehabilitation
Location : Binga
Date of contract : January 16, 2002 – February 15, 2002
Type of consulting service : INVESTIGATION SURVEY. This job includes GPS control survey, detailed topographic survey & river course plan and profile survey, and river cross-section survey.
Project Duration : 30days
Actual Project Completion : 29 days

NATIONAL POWER CORPORATION
Address : Diliman, Quezon City.
Name of project : Parcellary mapping and subdivision survey for the proposed Libmanan-Lupi 69 kV Transmission Line Project.
Location : Libmanan to Lupi in Camarines Sur
Date of contract : September 17, 20001- February 10, 2002
Type of consultancy service : PARCELLARY AND SUBDIVISION SURVEY. The job includes GPS control survey, topographic survey, route survey, research, subdivision and segregation of properties encroaching with the proposed T/L corridor.
Project Duration : 135 days
Actual Project Completion : 120 days

NEWJEC INCORPORATED
Address : 20-19 SHIMANOUCHI I-CHOME, CHUO-KU, OSAKA 542, JAPAN
Name of project : Feasibility study of the Binga Hydroelectric Power Station Rehabilitation
Location : Binga
Date of contract : January 3, 2002 – January 15, 2002
Type of consulting service : INVESTIGATION SURVEY. This job includes GPS control survey, detailed topographic survey & hydrographic survey.
Project Duration : 10 days
Actual Project Completion : 10 days

SOGREAH
Address : BP. 172-38042 Grenoble cedex 9 – France
Name of project : Ambuklao Hydroelectric Project
Location : Ambuklao and Binga
Date of contract : August 2001 – January 2002
Type of consulting service : INVESTIGATION SURVEY. This job includes GPS control survey, detailed topographic survey, river course plan, profile and section survey, hydrographic survey, sediment sampling & testing.
Project Duration : 150 days
Actual Project Completion : 140 days

IMPSA / CBK
Address : NPC Compound, Kalayaan, Laguna.
Name of project : River cross section survey of Lumot & Caliraya River for CBK.
Location : Laguna
Date of contract : (May 2001 – July 2001)
Type of consulting service : RIVER SURVEY. This job includes GPS control survey, topographic survey, profile and cross section survey.
Project Duration : 60 days
Actual Project Completion : 60 days

NATIONAL POWER CORPORATION
Address : Diliman, Quezon City.
Name of project : Parcellary mapping and subdivision survey for the proposed Santiago-Alicia 69 kV Transmission Line Project.
Location : Santiago to Alicia Cagayan
Date of contract : (March 20001 – July 2001)
Type of contract : PARCELLARY AND SUBDIVISION SURVEY. The job includes GPS control survey, topographic survey, control survey, route survey, research,
subdivision and segregation of properties encroaching the proposed T/L
corridor.
Project Duration : 120 days
Actual Project Completion : 110 days

T & D ENGINEERING CORPORATION
Address : Quezon City
Name of project : Investigation survey of the Proposed 69 kV San Manuel – Sison Transmission Line Route
Location : San Manuel to Sison Pangasinan
Date of contract : November 2000 – July 2001
Type of consulting service : INVESTIGATION SURVEY. The job includes geotechnical investigation, GPS control survey, detailed topographic survey,
route survey and preparation of plan and profile and parcellary survey.
Project Duration : 270 days
Actual Project Completion : June 21, 2001


NATIONAL POWER CORPORATION
Address : Diliman, Quezon City.
Name of project : Investigation survey of the Proposed 25 KMS of 69 kV Libmanan-Lupi Transmission Line – ST/SC
Location : Libmanan to Lupi in Camarines Sur
Date of contract : October 2000 – March 2001)
Type of consulting service : INVESTIGATION SURVEY. The job includes GPS control survey, detailed topographic survey, route survey and preparation of plan and profile.
Project Duration : 110 days
Actual Project Completion : 100 days

BASIC TECHNOLOGY AND MANAGEMENT CORP
Address : 2nd Floor, Prudential Bldg., cor Ermita St. and Sta Monica St., Ermita Manila.
Name of project : PASIG, SAN JUAN AND MARIKINA RIVER SURVEY
Location : Baseco, Pasig, San juan and Marikina.
Date of contract : August 2000 – February 2001
Type of consulting service : GEODETIC AND ENGINEERING SURVEY. This job includes GPS control survey, detailed topographic survey, hydrographic
survey, profile and cross-section survey of Pasig River outlet near
Baseco, River profile and cross section survey of San Juan and Marikina River.
Project Duration : DAILY BASIS
Actual Project Completion : AS REQUIRED

SOLID CEMENT CORPORATION
Address : Bo. Tagbac, Antipolo, Rizal.
Name of project : Detailed topographic survey and volumetric analysis of the PAMIAS QUARRY DEPOSIT for SOLID CEMENT CORPORATION.
Location : Antipolo Rizal
Date of contract : 2001
Type of consulting service : Volumetric survey. The job includes boundary survey, GPS control survey, detailed topographic survey, contouring and volumetric analysis.
Project Duration : 120 days
Actual Project Completion : 90 days

IMPSA / CBK
Address : NPC Compound, Kalayaan, Laguna.
Name of project : Detailed Engineering Survey of the CBK Project of IMPSA in Botocan and Caliraya.
Location : Laguna
Date of contract : 2000-2001
Type of consulting service : Geodetic, detailed engineering and parcellary survey Project Duration : DAILY CONTRACT
Actual Project Completion : AS REQUIRED
Actual Project Completion : 90 days

BASIC TECHNOLOGY AND MANAGEMENT CORP
Address : 2nd Floor, Prudential Bldg., cor Ermita St. and Sta Monica St., Ermita Manila.
Name of project : GPS SURVEY FOR THE PORTS OF ARGO,] BAIS, LOON & MALABUYOC
Location : Visayas
Date of contract : July 2000
Type of consulting service : GEODETIC SURVEY. GPS Survey of controls for each of the Ports of Argo, Bais, Larena, Loon & Malabuyoc in Visayas .

RIOFIL CORPORATION
Address : Rm 302, Hanston Bldg., Emerald Avenue, Ortigas Center, Pasig City
Name of project : Hydrographic Survey of the proposed site of port in Batangas
Location : Batangas
Date of contract : April 2000
Type of consulting service : HYDROGRAPHIC SURVEYING
Project Duration : 7 days
Actual Project Completion : 5 days

CEMEX
Address : Petron Mega Plaza, Makati City.
Name of project : Detailed topographic survey of the RIZAL CEMENT plant site and quarry site, SOLID CEMENT plant site and quarry site, ISLAND AGGREGATES quarry site for CEMEX PHILIPPINES using computerized system and CAD.
Location : Antipolo and Binangonan Rizal
Date of contract : July 1999 – February 2000
Type of consulting service : Detailed topographic and parcellary survey. This job includes boundary survey, GPS control survey, detailed topographic survey, contouring and volumetric analysis.
Project Duration : 120 days
Actual Project Completion : 100 days

CEMEX PHILIPPINES
Address : Petron Mega Plaza, Makati City.
Name of project : Topographic survey of the proposed plant site of CEMEX PHILIPPINES in PARANAQUE METRO MANILA by computerized method and CAD.
Location : Paranaque Metro Manila.
Date : 2000
Type of consulting service : Detailed engineering and property survey. The job includes boundary survey, control survey, contouring and volumetric analysis.
Contract Duration : 5 days
Actual Project Completion : 3 days

FORTUNE CEMENT CORP / CDSI
Address : Suite 401 Penthouse, ALCCO Bldg., Ortigas Avenue, Greenhills, San Juan, M Mla.
Name of project : Periodic monitoring of BULK MATERIALS
Location : Batangas
Date of contract : December 1999
Type of consulting service : Volumetric survey. The job includes boundary survey, GPS control survey, detailed topographic survey, contouring and  volumetric analysis.
Project Duration : 10 days
Actual Project Completion : 7 days

NATIONAL POWER CORPORATION
Address : Diliman, Quezon City.
Name of project : Parcellary and subdivision survey of TAYABAS- DASMARINAS 500 kV T/L project of NAPOCOR.
Location : Tayabas Quezon to Dasmarinas Cavite
Date of Contract : March 1999 – November 1999
Type of consulting service : PARCELLARY AND SUBDIVISION SURVEY. The job includes boundary survey, GPS control survey, parcellary and property survey, topographic survey, research, subdivision and segregation of properties encroaching the transmission line corridor.
Project Duration : 215 days
Actual Project Completion : 210 days

IMPSA / CBK
Address : NPC Compound, Kalayaan, Laguna.
Name of project : Caliraya, Botocan, Kalayaan Power Plant Project
Location : Caliraya, Botocan and Kalayaan Laguna.
Date of contract : 1999
Type of consulting service : Detailed engineering and property survey of various project sites for IMPSA in LAGUNA. The job includes boundary survey, control survey, as-built of existing structures and utilities, and delineation of proposed roads.
Project Duration : On call basis
Actual Project Completion : All work items are completed on time.

R. P. ALEJANDRO CONSTRUCTION CORPORATION
Address : Alejandro Bldg., II, M dela Fuente, Sampaloc, Manila.
Name of project : Detailed engineering survey on the proposed MANGGAHAN VILLAGE MALL in PASIG CITY, for R. P. ALEJANDRO CONSTRUCTION CORPORATION.
Location : Pasig City.
Date of contract : 1999
Type of consulting service : Detailed engineering and property survey. The job includes boundary survey, control survey, and layout of grid for the construction of the building.
Project Duration : 5 days
Actual Project Completion : 5 days

CDSI
Address : Suite 401 Penthouse, ALCCO Bldg., Ortigas Avenue, Greenhills, San Juan, M Mla.
Name of project : Detailed topographic and engineering survey of San Roque Multi-Purpose Project Site in San Roque, San Manuel Pangasinan for CDSI. (1999)
Location : San Manuel Pangasinan
Date of contract : 1999
Type of consulting service : Detailed topographic, route and engineering survey. The job includes GPS control survey, detailed topographic survey, profile survey, and layout of borehole locations and sections for seismic propagation.
Project Duration : 60 days
Actual Project Completion : 55 days

CMC DI RAVENNA
Address : Surigao
Name of project : Detailed Topographic survey of the proposed Plant site at Mainit Lake
Location : Surigao
Date of contract : July 1999
Type of consulting service : GEODETIC AND ENGINEERING SURVEY. The job includes GPS Survey, Contour Mapping, Profiling, Hydrographic Surveying and
Detailed Engineering Surveys.
Project Duration : 15 days
Actual Project Completion : 10 days

NATIONAL POWER CORPORATION
Addresss : Diliman, Quezon City.
Name of project : Parcellary and segregation survey of SUCAT-ARANETA- BALINTAWAK 230kV T/L project of NAPOCOR in Metro Manila.
Location : Sucat Paranaque to Balintawak, Quezon City.
Date of contract : October 16, 1998 – December 16,1998
Type of consulting service : PARCELLARY AND SUBDIVISION SURVEY. The job includes boundary survey, GPS control survey, parcellary and property survey survey, topographic survey research and segregation of properties
segregation of properties encroaching the transmission line corridor.
Project Duration : 60 days
Actual Project Completion : 30 days

DYWIDAG PHILIPPINES CORPORATION
Address : Naga, Cebu.
Name of project : Detailed engineering survey during the construction of cement silos of APO CEMENT PLANT in NAGA, CEBU for DYWIDAG PHILIPPINES CORPORATION.
Location : Naga, Cebu.
Date of contract : 1998
Type of consulting service : The job includes control survey, as-built of existing structures and utilities, and layout of grid for the construction of cement silos.
Project Duration : DAILY CONTRACT
Actual Duration: : All activities were completed as required satisfactorily.

ISLAND CEMENT
Address : Bo. Tagbac, Antipolo, Rizal
Name of project : Topographic survey of the mining claim and quarry site and as-built survey of plant site of ISLAND CEMENT using computerized method and CAD.
Location : Bo. Tagbac, Antipolo, Rizal.
Date of contract : 1998
Type of consulting service : The job includes boundary survey, control survey, detailed as-built survey, contouring and volumetric analysis.
Project Duration : 45 days
Actual Project Completion : 30 days

DAVAO UNION CEMENT CORPORATION
Address : Ilang, Davao City.
Name of project : Volumetric survey of bulk materials for DAVAO UNION CEMENT CORP.
Location : Ilang, Davao City.
Date of contract : 1997-1998
Type of consulting service : Volumetric survey. The job includes detailed topographic survey and volumetric survey.
Project Duration : Periodic volumetric survey
Actual Duration : ALL PROJECTS ARE COMPLETED WAY AHEAD OF PROJECT SCHEDULE

HI-CEMENT CORPORATION
Address : Norzagaray, Bulacan.
Name of project : Volumetric survey of bulk materials for HI-CEMENT CORPORATION.
Location : Norzagaray, Bulacan.
Date of contract : 1997-1998
Type of consulting service : Volumetric survey. The job includes detailed topographic survey and volumetric survey.
Project Duration : PERIODIC VOLUMETRIC SURVEY
Actual Duration : ALL PROJECTS ARE COMPLETED WAY AHEAD OF PROJECT SCHEDULE

RIOFIL CORPORATION
Address : Rm 302, Hanston Bldg., Emerald Avenue, Ortigas Center, Pasig City
Name of project : Various detailed engineering survey on different project sites for RIOFIL CORPORATION.
Location : Cavite and Laguna Industrial area, Batangas and Clark Field, Angeles Pampanga, Manila, Makati, Bulacan.
Date of contract : (1995-1997)
Type of consulting service : Detailed engineering and property survey. The job includes boundary survey, control survey, as-built of existing structures and
utilities, contouring and volumetric analysis.
Project Duration : VARIABLE
Actual Duration : ALL PROJECTS ARE COMPLETED WAY AHEAD OF PROJECT SCHEDULE

R. N. FERRER AND ASSOCIATES
Address : Padilla Bldg., Emerald Avenue, Ortigas Center, Pasig City
Name of project : Various detailed engineering survey on different project sites for RN FERRER AND ASSOCIATES.
Location : Laguna Industrial Area, Paranaque, Alabang, Muntinlupa, Manila.
Date of contract : (1995-1997)
Type of consulting service : Detailed engineering and property survey. The job includes boundary survey, control survey, as-built of existing structures and utilities, contouring and volumetric analysis.
Project Duration : VARIABLE
Actual Duration : ALL PROJECTS ARE COMPLETED WAY AHEAD OF PROJECT SCHEDULE

PHILLIPS SEMI-CONDUCTOR
Address : 9 Mt. Drive, Light Industry & Science Park II, Calamba, Laguna
Name of project : Various detailed engineering survey on different project sites for PHILIPS SEMI-CONDUCTORS PHILIPPINES EXPANSION.
Location : Calamba, Laguna
Date of contract : (1996)
Type of consulting service : Detailed engineering and property survey. The job includes boundary survey, control survey, as-built of existing structures and
utilities, contouring and volumetric analysis.
Project Duration : VARIABLE
Actual Duration : ALL PROJECTS ARE COMPLETED WAY AHEAD OF PROJECT SCHEDULE

WEBFORGE PHILIPPINES CORPORATION
Address : c/o RN FERRER AND ASSOCIATES
Name of project : Various detailed engineering survey on different project sites for WEBFORGE PHIL. CORP.
Location : Paranaque
Date of contract : 1996
Type of consulting service : Detailed engineering and property survey. The job includes boundary survey, control survey, as-built of existing structures and utilities, contouring and volumetric analysis. 
Project Duration
 : VARIABLE
Actual Duration : ALL PROJECTS ARE COMPLETED WAY AHEAD OF PROJECT SCHEDULE

AMKOR ANAM PILIPINAS INC.
Address : Km 22 East Service Rd., South Super Hi-way, Muntinlupa, M.Mla
Name of project : Various detailed engineering survey on different project sites for AMKOR ANAM PILIPINAS INC EXPANSION.
Location : South Super Highway, Paranaque, Metro Manila.
Date of contract : 1996
Type of consulting service : Detailed engineering and property survey. The job includes boundary survey, control survey, as-built of existing structures and utilities, contouring and volumetric analysis.
Project Duration : VARIABLE
Actual Duration : ALL PROJECTS ARE COMPLETED WAY AHEAD OF PROJECT SCHEDULE

ISLAND QUARRY AND AGGREGATES CORPORATION
Address : Bo. Tagbac, Antipolo, Rizal
Name of project : Topographic survey of the mining claim and quarry site of ISLAND QUARRY AND AGGREGATES CORPORATION by computerized method and CAD.
Location : Bo. Pantay, Antipolo, Rizal
Date of contract : 1994
Type of consulting service : Volumetric survey. The job includes boundary survey, control survey, contouring and volumetric analysis.
Project Duration : 30 days
Actual Project Completion : 20 days

SOLID CEMENT CORPORATION
Address : Bo. Tagbac, Antipolo, Rizal
Name of project : Topographic survey of the mining claim and quarry site of SOLID CEMENT by computerized method and CAD.
Location : Bo. Tagbac, Antipolo, Rizal
Date of contract : 1993
Type of consulting service : Volumetric Survey. The job includes boundary survey, control survey, contouring and volumetric analysis.
Project Duration : 90 days
Actual Project Completion : 70 days

EDCOP
Address : Legaspi Village, Makati City
Name of project : Topographic survey of ENRON’s project site by computerized method and CAD for EDCOP.
Location : BATANGAS.
Date of contract : 1993
Type of consulting service : Digital Mapping. Conversion of survey data into a digital map.
Project duration : 30 days
Actual Project Completion : 10 days

PANACORP
Address : Bo. Pantay, Antipolo, Rizal
Name of project : Topographic survey of the mining claim and quarry site of PANACORP by computerized method and CAD.
Location : Bo. Pantay, Antipolo, Rizal.
Date of contract : 1993
Type of consulting service : Detailed topographic survey. The job includes boundary survey, control survey, contouring and volumetric analysis.
Project duration : 60 days
Actual project completion : 45 days